Thursday, October 6, 2011

Cabin re-construction progress

Things are going well on the cabin re-construction project. It was a good feeling to have the pins and holes in the top four logs mate locking together the walls.
From the four logs were replaced in the back wall shorter logs were cut to replace rotted logs by the doors and windows.
The history is that this 12' by 16' cabin was the 1860's home to a local family with 8 children!
Next up will be resizing the window openings and framing them to fit the new windows. Then it will be on to the roof rafters.

No comments:

Post a Comment